AVR Coal Move 7_20_08 |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

109 viewsHere come the loaded AVR coal train dow the connection. The front- track is the line to Washington Pa. 7/20/08.
|
|

107 viewsAnother shot.... loaded hoppers are starting to squeal around the curve. 7/20/08.
|
|

115 viewsAnother view...up-close.
|
|

105 viewsAnother view of the units headed up the AVR connection to pick- the coal loads. 7/20/08. 10:40 A.M.
|
|

113 viewsWith the power shuffle complete, the AVR units now shove-up tp the W&LE end to pick up the 50 loaded hoppers 7/20/08. 10:35 A.M.
|
|

110 views
|
|

102 views
|
|

114 viewsAnother view...of the shuffle 7/20/08.
|
|

136 viewsUp close view of the power shuffle at the AVR end of the inter-change. 7/20/08 about 10 A.M.
|
|

138 viewsBruceton AVR/SWP inter-change coal train power shuffle. This view comming down the inter-change 7/20/08.
|
|

129 views...and away they go! Clearing the AVR switch and heading North with loaded coal train. Heads-up B&P and AVR fans. 7/20/08.
|
|

126 viewsHere is a shot of the mixed-bunch of loaded B&P hoppers comming off the AVR/W&LE connection. Sunday Morning 7/20/08.
|
|
| 14 files on 2 page(s) |
 |
1 |  |
|