The The P&WV Hi-Line
P&WV Technical and Historical Interest Group
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Clairton Branch News 4/30/15

 
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages
View previous topic :: View next topic  
Author Message
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Thu Apr 30, 2015 11: 12 am    Post subject: Clairton Branch News 4/30/15 Reply with quote

Clairton Branch news up-date & info from the gang foreman. " The Rush is ON! "
10 A.M. , 11-man (skeleton crew) #1 track gang was busy
pulling all spikes and setting/spiking one new tie every five spaces or so.
This to maintain gauge and safe movement for the Rail & Tie
equipment on the entire branch. Some ROW sections from Pierce to about MP 2 has new ties (12.500. total)
under almost all the old rail.
MOW crews are in very short supply & stretched thin on the WLE.
They hope to have two(2) full crews soon.

Early next week, a Ribbon-Rail-Train will deliver/drop new rail on all the Clairton branch
curves. New-Stick (CWR) will be used on the straight sections.
Four(4) New Switches. one at Pierce, and 3 at Clairton Yard to be installed.
About 30 car-loads of ballast to be surfaced & groomed.
NS to do a lot of Signal/Switch/Turn-out work at the new inter-change block on their River-Line.

Both WLE and AVR (Carload Express are actively vying for this major
inter-change business. WE wants new interchange traffic with NS.
Coke/Coke Bi-Products along with other assorted freight.

...took some pics to post soon. BTW birdie-talk, looks like at some point the entire
East-End main line, Pierce to Connellsville to get CWR as well.
Improvements to better serve the Monessen Plant and increased inter-change business with
CSX and SWP(Carload Express) traffic.
Back to top
View user's profile Send private message
pitt1292 photography



Joined: 25 Apr 2015
Posts: 23
Location: Pittsburgh, Pa

PostPosted: Fri May 01, 2015 10: 23 am    Post subject: Reply with quote

I believe the empty rail train left Mingo Jct the other day to get loaded with rail for the branch.
Also as a side note the six axles would be restricted to 5mph on the branch
Back to top
View user's profile Send private message Visit poster's website
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Fri May 01, 2015 11: 50 am    Post subject: Branch Power Reply with quote

HMmmm... interesting. maybe save some wear & tear on the bridge & curves?
GP-40-3's would be nice, but Hey, the P&WV 101 could create some
great historical image shots as well.

6:30p.m. Clairton Branch, MOW 10ton crane , gon & flat-car and
several additional pieces of track equipment are staged near the
Rt.51 X'ing. Don't think WLE will work the week-end. Monday A.M. should see lots of branch action.
Back to top
View user's profile Send private message
pitt1292 photography



Joined: 25 Apr 2015
Posts: 23
Location: Pittsburgh, Pa

PostPosted: Fri May 01, 2015 10: 40 pm    Post subject: Reply with quote

When I talked to a crew they said they would be restricted to 5mph because of how tight the curves on the branch, when they ran the tie train back on 4/16 the crew was talking about how that six axle felt like it was going to spread the gauge. Also one last side note, it was also mentioned that NS would want atleast 80 car trains from WLE
Back to top
View user's profile Send private message Visit poster's website
jayrod



Joined: 19 Oct 2007
Posts: 494
Location: Akron, OH

PostPosted: Sun May 03, 2015 8: 26 am    Post subject: Reply with quote

Hmmm... Any ideas on what the interchange traffic would be? Tanks out of Hopedale & Westland? I haven't heard anything from Brewster yet. Certainly wouldn't be coke out of Clairton - NS has their own access to the Clairton Works. NS will have to extend their portion of the interchange quite a bit to fit 80+ cars. All in all, that's a lot of work. And how does Carload Express fit into all of this? Inquiring minds want to know...
_________________
Eric Schlentner
Aka, jayrod
Back to top
View user's profile Send private message Send e-mail Visit poster's website
Display posts from previous:   
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB 2.0.20 © 2001, 2002 phpBB Group