The The P&WV Hi-Line
P&WV Technical and Historical Interest Group
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Old Archive Up-Date Material

 
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages
View previous topic :: View next topic  
Author Message
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Wed Oct 19, 2011 7: 19 am    Post subject: Old Archive Up-Date Material Reply with quote

This past week-end your Hi-Line staff has been very busy.
About 700 pages or so of AFE/AFR reports from 1957,58',59'. and
60' have been cleaned, scanned & adjusted.
Also 400 pages or so ...
The Pittsburgh & West Virginia Railway Company
Office of the General Superintendent
General Notice Bulletins from 1950 to 1963
Some very interesting and suprising information on the day-to-day operations
on the P&WV. The line drawings at Mingo Jct., Bridgeville's
American Cyanamid Plant, and Monessen Yard & "Y" are included.
Really neat & detailed stuff!
GPS, just continues to send-over more, & More, & MORE,
Archive File materials.

We hope to post/archive these very soon!

JR/JZ.
Back to top
View user's profile Send private message
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Tue Oct 25, 2011 7: 32 am    Post subject: Archive Materials Reply with quote

Recently GPS has sent over another great batch of original "Archive Material" (including several large binders)
of P&WV/WM/P&LE combined traffic operations, procedures, conditions and proposals Circa:
Dec.1930 to Dec. 1965(N&W era.).
These letters, reports, & notes are all originals, and include many great details
that covers C'ville/Bowest/Dickerson Run inter-change operations in the P&WV era. and(early N&W days)
Traffic-Power-Crew operations on the East-end(C'ville Div.) information that few
P&WV/WM/P&LE fans may have never seen, read, or know about.
Just a stunning, interesting read on early Alphabet Route operations!

A small sample:

P&WV request for/to engines taking coal, water,
other supplies and turning the engines on the Wye at Bowest Jan.27, 1931.

Proposed use by WM Railway of P&WV FM Locomotives between
Bowest & Cumberland, Oct.27, 1953. Operations report:
2(two) P&WV 2000 HP Diesel Units. Bowest to Cumberland and return.

Alpha-Jet time & cost issues. Including letters, notes & suggestions to/from
the RDG-WM-P&WV-NKP companys on how to improve/increase traffic operations.

WM reports of dead or failed N&W units after being received at Bowest.
May.6 1969,--- May 26, 1970-- N&W Locomotives receiving Terminal Attention
at Bowest detailed list & dates.

Another "Great Save" of local R.R. History by GPS.
Back to top
View user's profile Send private message
Rich_S



Joined: 23 Aug 2011
Posts: 253
Location: Baden, PA

PostPosted: Tue Oct 25, 2011 9: 25 am    Post subject: Re: Archive Materials Reply with quote

[quote="PWVJer"]
Proposed use by WM Railway of P&WV FM Locomotives between
Bowest & Cumberland, Oct.27, 1953. Operations report:
2(two) P&WV 2000 HP Diesel Units. Bowest to Cumberland and return.

[/quote]

It's funny you mention this as I just received a DVD from Clear Block Productions titled "Vignettes of the Western Maryland, Volume 1" and the DVD shows 4 H20-44's (The video is not clear enough to read numbers) pulling an Eastbound train past the WM's Cumberland Station.

How often did P&WV power run through to Cumberland?

Regards,
Rich S.
Back to top
View user's profile Send private message Send e-mail
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Wed Oct 26, 2011 7: 36 am    Post subject: Power swap Reply with quote

At this point we are not really sure of the circumstances of these power arrangements.
Archive Files related to these P&WV FM power
visits on the WM in the late 50's, early 60's seem to point to:
... No strict set of power arrangements, only
current, specific, real-time-need factors such as:

Crew & Power (WM & PWV) availibility, the volume of AJ-traffic, and most important:
The Time combination!
How best to save time, and the keep these very important
Alpha-Jet* train movements on a strict performance schedule.

Maybe some WM historian can help add the hard, true facts.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB 2.0.20 © 2001, 2002 phpBB Group