The The P&WV Hi-Line
P&WV Technical and Historical Interest Group
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

WLE Branch & AVR Siding up-dates

 
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages
View previous topic :: View next topic  
Author Message
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Sat May 23, 2015 12: 44 pm    Post subject: WLE Branch & AVR Siding up-dates Reply with quote

Sat. AM. Clairton Branch work, 90% of the 5-mile branch
has had all worn ties replaced. S.H. ribbon-rail laying next to
many hard curves. MOW equipment staged at
Rt. 51 X-ing
and at Clairton Yard area. Stub siding near Rt. 51
has been cleared, and all worn ties & old switch marked for replacement.
Some ROW fill-ditching-drainage-culvert
issues at about M.P. 3.75 and 3.9 remain, and need work. Clairton Yard/Tunnel,
main branch line has almost all new ties replaced. Running & yard-lead
tracks have about 1000 or so ties staged on the rail heads. Yard-end of the
Ravensburg tunnel to get additional drainage & pre-surface work.

In general, after walking most of the branch my guess, if the WLE "had"
to really move a Coke-train, they could. However, with very restricted
speed & power considerations. Lots of over-all surface, ballast, ROW grooming
and ditching remain....


______________________________________________________

AVR/WLE Bruceton interchange siding. All ROW pre-surface work finished. Piles of new tie-plates,
three(3) new switches, spikes, and rail-clips staged near the AVR main
(Bratti-Bros. lot.)
No tie-stack-bundles yet. All the new rail staged near the Curry Hollow Bridge has been
Ther-Mite-Weld* and now long ribbons of rail are staged on the entire
ROW. Both the main-line & siding will get CWR.
New north-switch area is now marked for placement. The Whitehall tunnel,
and exit main line approach to this switch also has new CWR staged on ROW.

... shot 31 Nikon-images this A.M. Will get with JR and place in the
Hi-line photo sharing file as soon as time permits.
Back to top
View user's profile Send private message
Rich_S



Joined: 23 Aug 2011
Posts: 253
Location: Baden, PA

PostPosted: Fri Jun 12, 2015 6: 50 pm    Post subject: Reply with quote

Any further updates on the Clairton Branch?
_________________
Regards,
Rich S.
Back to top
View user's profile Send private message Send e-mail
PWVJer



Joined: 13 Dec 2005
Posts: 946

PostPosted: Sat Jun 13, 2015 6: 15 am    Post subject: Branch Work Reply with quote

...a bit more work was done last week, I took a bunch additional shots.
More yard/tunnel/NS connection work. Several creek wash-out-erosion areas
look to soon be addressed.(very near the PAT Park & Ride lot).
AVR...as of thurs-nite all equipment and CWR materials (less ties)
staged near/on the new siding. Heavy New Ballast to top of rail-head, is now on
the AVR main from Whitehall tunnel to Bruceton X-ing.
Will try for more images this week-end. Our plan to post all
very soon.
Back to top
View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB 2.0.20 © 2001, 2002 phpBB Group