The The P&WV Hi-Line
P&WV Technical and Historical Interest Group
 
 FAQFAQ   SearchSearch   MemberlistMemberlist   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

Trackage rights on the WM/Chesse system to Maryland

 
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages
View previous topic :: View next topic  
Author Message
Glenn Blum



Joined: 14 Dec 2009
Posts: 1

PostPosted: Mon Dec 21, 2009 10: 37 am    Post subject: Trackage rights on the WM/Chesse system to Maryland Reply with quote

This is a modern question of the W&LE but I had read that the W&LE has trackage rights to Cumberland Maryland. Is this over the "SAND PATCH section of the B&O?

Thanks and Merry Christmas!
Back to top
View user's profile Send private message
Longview Station



Joined: 16 Apr 2005
Posts: 176
Location: Longview Station

PostPosted: Mon Dec 21, 2009 12: 26 pm    Post subject: Reply with quote

Glenn:

The modern W&LE has trackage rights between Connellsville Pennsylvania and Hagerstown Maryland via Sand Patch and Cumberland. It also had trackage rights over CSX from Connellsville to New Stanton, Pennsylvania that date (1975) to the WM being absorbed into Chessie.

I don't think any N&W/NS crews actually operated over Chessie to Hagerstown, as it was a means to protect overhead freight traffic coming off the P&WV to points east. The N&W cured that problem when it transferred the P&WV lease to the modern W&LE and diverted all Hagerstown traffic off the P&WV and onto their own main track.

However, the modern W&LE I was told did operate 2 or 3 crews over CSX to New Stanton in the early 1990's before the CSX line went to Carload Express...nowadays the SWP.

These days W&LE Crews operate into Everson on the SWP via the new connection at Mile Post 5, a distance of about 2 miles. The connection at Mile Post 5 is a modern connection constructed several years back, that followed in the foot prints of a former connection built there at Mile Post 5 in 1930 when the P&WV constructed one between the PRR at Owensdale (Mile Post 5) and the P&WV so they could route P&WV work trains over the PRR to aide in the construction of the new 40 mile P&WV Extension into Connellsville.

W&LE crews for years operated over Chessie to Hagerstown taking grain from Ohio for feed mills near Harrisonburg, Virginia. The W&LE crews of course had Chessie Pilots for a time, then a former Chessie Engineman came to work for the W&LE and who was qualifed on the Chessie. The W&LE was starting to make progress in having their own employees qualified on Chessie but the grain business was lost and for the most part, W&LE crews no longer run to Hagerstown.

(That run I would of loved to have)

VW
Back to top
View user's profile Send private message Send e-mail
Display posts from previous:   
Post new topic   Reply to topic    The P&WV Hi-Line Forum Index -> Messages All times are GMT - 5 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB 2.0.20 © 2001, 2002 phpBB Group